Athea Engineering Inc.

Services

Earthwork, start to finish.

Six scopes that often land on the same site.

Cleared lot after demolition with the remaining slab grid exposed and silt fence at the perimeter
Lot cleared to slab

Demolition

Take down what is there. Leave a site you can build on.

We remove structures, foundations and slabs to the limits shown on your plans, with attention to whatever is staying: adjacent buildings, trees and utilities.

  • Structure demolition
  • Foundation and slab removal
  • Concrete breaking with a hydraulic hammer
  • Site clearing
Excavators working in a deep excavation beside an existing building
Excavation beside an existing building

Excavation and subterranean work

Dig to the elevation on the plans and hold the sides while you build.

Below-grade excavation, including cuts close to existing structures. We excavate, shore where the cut requires it, and grade.

  • Below-grade excavation
  • Shoring
  • Grading
Trench excavated along an existing wall with an excavator and a compaction roller at the far end
Trench along an existing wall

Utility trenching

Trenches cut to line and depth, and closed up properly.

We excavate trenches for underground utilities. Once the line is in, the trench is backfilled and compacted so the surface above it does not settle later.

  • Trench excavation for underground utilities
  • Backfill and compaction
  • Open-trench signs and barricades
Sandbags, caution tape and an open trench sign protecting an excavation at a street corner
Sandbag line at a street-side excavation

Erosion control

Keep the soil on your site and out of the street.

Open ground and rain are a bad combination for a schedule and for the neighbors downhill. We install the measures your erosion control plan calls for.

  • Sandbag barriers
  • Silt fence
  • Plastic sheeting and slope cover
Geogrid reinforcement laid along the base of a cut slope next to a road
Geogrid along the base of a roadside slope

Slope repair and landslide remediation

Clear the slide. Rebuild the slope so it stays.

When a slope fails, the slide material has to come out and the slope has to be rebuilt to the geotechnical engineer's recommendations. Access is often the hard part: the road, the homes and the hillside itself all limit how equipment can reach the work.

  • Slide material removal
  • Geogrid-reinforced slopes
  • Rock placement
Crew in high-visibility vests working at the road edge with cones marking the work zone
Cones at the road edge

Traffic control

Work beside the road without closing it.

Earthwork often happens at the edge of a street. We set up the traffic control the work zone needs, so drivers know where to go and the crew has room to work.

  • Work zone signs
  • Cones and delineators at the road edge

Not sure which scope applies?

Describe the site and we will sort it out.

310-717-1251